    Commercial & Retail Fit-Out

    Cat A and Cat B fit-out connecting the building's base provision with the operational needs of landlords, office occupiers and retailers.

    From base-build interfaces to an operational space

    Cat A work establishes the agreed base specification, while Cat B work adapts the interior to an occupier's layout, finishes and operating requirements. DSJ Construction defines the boundary between landlord works, tenant works and retained building systems before packages are released.

    Partitions, ceilings and raised floors need to work with mechanical and electrical layouts, access requirements and fire strategies. DSJ Bespoke joinery and retail shopfront packages are coordinated with these interfaces rather than treated as isolated finishes.

    We plan inspections and close-out around landlord and tenant requirements. Consent-to-trade and handover documentation are assembled to the agreed requirements, with approvals remaining with the relevant landlord, authority or other responsible party.

    Interior construction works

    Fit-out packages and interfaces

    Partitions and ceilings

    Coordinate room layouts, acoustic requirements and ceiling zones with doors, lighting and service access.

    Raised access floors

    Set out floor systems with service routes, thresholds and the agreed finish interfaces.

    DSJ Bespoke joinery

    Bring made-to-measure joinery into the fit-out sequence with agreed setting-out and installation details.

    Retail shopfronts

    Coordinate frontages, entrances and finishes with landlord details and the retail unit's trading requirements.

    M&E coordination

    Resolve mechanical and electrical interfaces with the base build, ceiling systems and occupier installations.

    Landlord and tenant close-out

    Gather the records, inspections and consent-to-trade information required for the agreed handover.

    Preparing the interior for occupation or trading

    1

    Confirm the Cat A/Cat B boundary

    Review lease and landlord requirements alongside the occupier's brief to establish inclusions and retained provisions.

    2

    Coordinate the setting-out

    Check room layouts, shopfront details, joinery dimensions and service routes before materials are committed.

    3

    Sequence finishes and services

    Link fit-out packages to testing and inspection points so completed work remains accessible where needed.

    4

    Assemble the occupation pack

    Prepare the agreed handover and trading documentation, identify outstanding approvals and brief the incoming operator.